Oil & Gas | DRILLING OPERATIONS | RIG MOVE

Rig Move Approval Software for Drilling Operations

Kissflow routes a rig relocation through a route and right-of-way check, a weather and load plan review, and multi-stage approval with delegation, so a rig doesn't skid, walk, or transport to the next pad without a documented clearance signed off behind it.

Rig Move Approval Management System

Trusted by energy operators worldwide

Puma Energy
TotalEnergies
Unioil
McDermott
Essar
Modec

A rig doesn't walk to the next pad because someone felt like it was time.

Moving a land rig means skidding or walking it across a lease road, checking right-of-way permissions along the route, and confirming the new location has been surveyed and prepped. Moving a jack-up offshore means a tow plan, a weather window, and a preload check at the new location before the legs go down. Either way, the move itself is a hazard window: a low-boy transport crossing a public road, or a rig under tow in open water, both need sign-off from more than one person before they start.

Kissflow runs rig move clearance as an approval workflow: a rig move request intake that captures the origin, destination, and move method, a route and right-of-way check for overland moves or a weather and load plan review for an offshore tow, multi-stage approval with delegation so the move isn't held up waiting on one signature, and a move execution log that records the actual timeline against the plan.

By the time the rig arrives and rig-up starts at the new location, there's a record of exactly who cleared the route, the weather window, and the load plan, and when each sign-off happened relative to departure.

Where rig move clearance breaks down before a relocation

Right-of-way isn't confirmed before the move starts

A low-boy transport crosses a lease road without a documented check that access was actually secured.

Weather windows are judged informally

An offshore tow gets a go-ahead based on someone's read of the forecast, not a documented weather and load plan review.

Approval waits on one signature

The move sits on hold because the one person who can clear it is unreachable.

No record of the actual move timeline

When the move takes longer than planned, there's no log showing what happened and when.

Six modules. Every rig move checked, cleared, and logged before and during the relocation.

Configure move types, approval chains, and weather or right-of-way criteria to your operation.

Rig move request intake

The rig site submits the origin, destination, and move method, whether a skid, a walk, or a full low-boy transport.

Route and right-of-way check

For overland moves, access and right-of-way permissions along the route are confirmed and logged before the move clears.

Weather and load plan review

For an offshore tow or a heavy overland transport, the weather window and load plan are reviewed before departure.

Multi-stage approval with delegation

The move clears through the required approval chain, with delegation so it doesn't stall waiting on one signature.

Move execution log

The actual move timeline is logged against the plan, from departure through rig-up at the new location.

Audit trail and status dashboard

Operations sees the status of every planned and in-progress rig move across the fleet in one live dashboard view.

From request to system of record in four steps

Submit

Submit

The rig site submits the origin, destination, and move method for the planned relocation.

Review

Review

Right-of-way is confirmed for an overland move, or a weather and load plan is reviewed for a tow.

Approve

Approve

The move clears through the required approval chain, with delegation if a signer is unavailable.

Record

Record

The actual timeline is recorded against the plan through arrival and rig-up at the new site, a documented clearance behind every move.

What changes when rig move approval runs on Kissflow

Process
Before Kissflow
On Kissflow
Move request
A verbal heads-up to the office
A structured request with origin, destination, and move method
Right-of-way check
Assumed secured, confirmed after the fact if at all
Checked and logged before the move is cleared
Weather and load review
A judgment call based on someone's forecast read
A documented review before departure
Approval chain
Waits on one signature
Delegation keeps the clearance moving
Move timeline
Reconstructed from memory after the fact
Logged in real time from departure to rig-up
Move history
Scattered across individual moves
A searchable record across every rig and every route
Process Before Kissflow On Kissflow
Move request A verbal heads-up to the office A structured request with origin, destination, and move method
Right-of-way check Assumed secured, confirmed after the fact if at all Checked and logged before the move is cleared
Weather and load review A judgment call based on someone's forecast read A documented review before departure
Approval chain Waits on one signature Delegation keeps the clearance moving
Move timeline Reconstructed from memory after the fact Logged in real time from departure to rig-up
Move history Scattered across individual moves A searchable record across every rig and every route

Connects to your ERP or logistics system for transport and permitting; Kissflow doesn't replace your system of record

Kissflow runs the request, review, and approval layer for the move itself. Your ERP or logistics system stays the system of record for transport contracts and permits.

Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo

Built for how a rig move actually gets cleared

Right-of-way checked before departure

Access along the route is confirmed and on record, not assumed.

Weather and load plans reviewed, not eyeballed

An offshore tow or heavy transport gets a documented review before it starts.

Delegation keeps the move on schedule

A clearance doesn't stall because one approver is unreachable.

Live in weeks

Configure move types and approval chains in the visual builder, or describe the use case to the AI Builder.

Governed from day one

Role-based access and a full audit trail on every request and approval.

One view across every rig and route

Operations tracks every planned and in-progress move without a string of phone calls.

We help drilling operations clear a rig move before it starts, not after

McDermott

“If a company cannot enable everybody to use AI, they will never get the true benefit of AI. Platforms like Kissflow allow us to put that capability in the hands of our users in a safe way.”

Vagesh Dave

GVP & CIO at McDermott International, Ltd

See The Full Story
KEY HIGHLIGHTS
5M+
work items processed
5,526
active users
400+
active workflow created without IT dependency
Puma Energy
INDUSTRY Energy
HEADQUATERS USA

“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”

Tanay Tiwary

Global Head - Digitalization & Business Improvement

See the Full Story
KEY HIGHLIGHTS
700+
Use Cases
73%
Operation Efficiency
1001 - 5000
# of Employees
SN Aboitiz Power Group

“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time.”

Maria Theresa Cabigon

CIO, SN Aboitiz Power Group

See The Full Story
KEY HIGHLIGHTS
451%
ROI
2.8 months
Payback period
Previous
    Next

    See what Kissflow can do for you

    Talk to us

    Got questions? We're here to help.

    Get Support

    No. Your ERP or logistics system stays the system of record for transport contracts and permits. Kissflow runs the request, review, and approval layer for clearing the move itself.

    HAZMAT Transport Authorization Management System governs regulated cargo, like chemicals or radioactive logging sources, moving to and from a site. This app governs relocating the rig itself between well pads or locations.

    Site Onboarding and Commissioning Management System stages a facility toward first startup. This app approves relocating the rig asset itself between well pads, not commissioning a facility.

    Yes. Move type is configurable, so a land rig skid or walk follows a route and right-of-way check, while an offshore tow follows a weather and load plan review.

    Whoever you configure, typically the rig manager and, for offshore or long-distance moves, an operations or HSE reviewer.

    Yes. The move execution log records departure, transit, and rig-up against the planned schedule.

    Configuration and AI-assisted app generation move delivery from a multi-month program to a matter of weeks.

    Kissflow is certified to SOC 1, SOC 2, SOC 3, and ISO/IEC 27001, with role-based access and a full audit log on every request and approval.