Turnaround Work Scope Approval Software for Shutdown Planning
Kissflow routes every proposed turnaround work item through discipline review, multi-stage approval with delegation, and a cost and schedule impact check, so the scope that gets frozen is the scope that was actually approved, not the longest list nobody challenged.
Trusted by energy operators worldwide
A turnaround work list is a budget with a deadline.
Every discipline lead wants their job on the list: a valve that has been weeping since the last run, an exchanger bundle due for cleaning, an instrument loop overdue for calibration. Each addition after scope freeze eats schedule float and cost contingency that were already spoken for. A spreadsheet can hold the list. It cannot tell planning who justified a late addition, route it past the discipline lead and the turnaround manager before the freeze date, or show a sponsor the cost and schedule impact before they sign off.
Kissflow runs turnaround scope as an approval workflow: a structured intake form for every proposed work item, multi-stage approval with delegation and escalation so a request does not stall because one approver is offshore, a live audit trail of who approved what and when, and a requester self-service portal so a discipline lead can see where their item sits without a phone call to planning.
Once scope freezes, the same record becomes the baseline the execution team works from and the number the cost estimate was built against, not a list reconstructed from email threads after the fact.
Where turnaround scope control breaks down before freeze
Justification lives in someone's memory
A work item gets added because a discipline lead argued for it in a meeting, with no record of why it made the cut.
Approval stalls behind one person
A request sits in an inbox because the one approver who can sign off is offshore or on leave, with no delegation path.
Cost and schedule impact surface too late
Nobody totals the impact of late additions until the turnaround manager is already over budget.
The frozen scope isn't actually frozen
Without an audit trail, late items keep sliding in after the freeze date with no record of who approved the exception.
Six modules. Every scope item approved, costed, and on the record before freeze.
Configure discipline categories, approval chains, and freeze dates to your turnaround.
Scope item intake
A discipline lead submits a work item with justification, discipline, and estimated cost and duration through a structured form.
Discipline review
The item routes to the relevant discipline lead for technical justification before it enters the approval chain.
Multi-stage approval with delegation
Approval moves through planning and the turnaround manager, with delegation rules so an offshore or absent approver doesn't stall the chain.
Cost and schedule impact rollup
Every approved item rolls into a live total against the turnaround's cost and schedule contingency.
Scope freeze and audit trail
Once the freeze date passes, every addition requires a documented exception approval, timestamped and attributed.
Requester self-service portal
A discipline lead checks the status of their own request without a call to planning.
From request to system of record in four steps
Submit
A discipline lead submits a proposed scope addition with justification and estimated cost.
Review
The item goes to the discipline lead and planning for technical review and sign-off.
Approve
Multi-stage approval moves through the chain, escalating automatically if an approver is unavailable.
Record
Approved items roll into the frozen scope baseline and the live cost and schedule rollup, so the frozen scope is the scope that was actually approved.
What changes when turnaround scope approval runs on Kissflow
| Process | Before Kissflow | On Kissflow |
|---|---|---|
| Scope item request | An email or a hallway conversation with the turnaround manager | Structured intake form with justification, discipline, and cost estimate |
| Discipline sign-off | Verbal agreement in a planning meeting | Routed for review with a record of who approved and why |
| Approval chain | Stalls when the one approver is unavailable | Delegation and escalation keep the request moving |
| Cost and schedule impact | Totaled manually, often after freeze | Rolled up live against contingency as items are approved |
| Scope freeze | A date on a calendar, not enforced | Every post-freeze addition requires a logged exception approval |
| Status visibility | Discipline leads call planning to check | Self-service portal shows real-time status |
Connects to your ERP or maintenance management system for work orders; Kissflow doesn't replace your system of record
Kissflow runs the scope approval and audit trail layer. Your ERP or EAM system stays the system of record for the work order and the cost ledger.


Built for how turnaround scope actually gets decided
Delegation that keeps approvals moving
An approval doesn't stall because one person is offshore or on leave.
A freeze date that holds
Every post-freeze addition requires a logged exception, not a quiet edit to the list.
Cost impact visible before it's a surprise
The turnaround manager sees the running total against contingency as items are approved, not after.
Live in weeks
Configure discipline categories and approval chains in the visual builder, or describe the use case to the AI Builder.
Governed from day one
Role-based access and a full audit trail on every request and approval.
One portal for every discipline lead
Mechanical, instrumentation, and inspection leads all see the same live scope list.
Related apps
Turnaround Readiness Management System
Coordinate the multi-week readiness program, mobilization, spares, and permits ahead of a shutdown or turnaround.
Shutdown and Turnaround Manager
Execute a single turnaround from scope through punch-list closure.
Asset Reliability & Turnaround Orchestration Workflow
Decide when and why a turnaround happens as part of the longer-horizon reliability program.
We help turnaround teams keep scope a decision, not a habit

“If a company cannot enable everybody to use AI, they will never get the true benefit of AI. Platforms like Kissflow allow us to put that capability in the hands of our users in a safe way.”
Vagesh Dave
GVP & CIO at McDermott International, Ltd
See The Full Story

“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”
Tanay Tiwary
Global Head - Digitalization & Business Improvement
See the Full Story

“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time.”
Maria Theresa Cabigon
CIO, SN Aboitiz Power Group
See The Full StorySee what Kissflow can do for you
Talk to usGot questions? We're here to help.
Get SupportNo. Your ERP or EAM system stays the system of record for the work order and cost ledger. Kissflow runs the scope request, approval, and audit trail layer that feeds it.
Turnaround Readiness Management System runs the multi-week program that gets a shutdown ready to execute: mobilization, spares, permits, and a milestone go or no-go decision, of which scope freeze is one milestone. This app is the item-by-item approval engine that produces that scope freeze, routing each proposed work item through discipline review and sign-off.
Shutdown and Turnaround Manager executes the turnaround once scope is frozen, from work-list build through punch-list closure. This app governs the decision of what belongs on that list in the first place.
Yes. Delegation rules route a request to a backup approver automatically if the primary approver doesn't act within a configured window.
It requires a logged exception approval, with the reason and impact recorded, instead of a quiet addition to the list.
Yes. Every approved item rolls into a live total against the turnaround's cost and schedule contingency.
Configuration and AI-assisted app generation move delivery from a multi-month program to a matter of weeks.
Kissflow is certified to SOC 1, SOC 2, SOC 3, and ISO/IEC 27001, with role-based access and a full audit log on every request and approval.