Oil & Gas | DRILLING & WELL CONSTRUCTION | CASING & CEMENTING

Casing and Cementing Approval Software for Well Construction

Kissflow routes every casing string and cement job through technical review, multi-stage approval, and a pressure-test and cement-bond-log evidence record, so the well doesn't move to the next stage until zonal isolation is confirmed, not assumed.

Casing/cementing Approval Management System

Trusted by energy operators worldwide

Puma Energy
TotalEnergies
Unioil
McDermott
Essar
Modec

The cement job either isolates the zones or it doesn't.

A casing string gets run, cement gets pumped behind it, and the well waits on cement before drilling continues or the completion goes in. There is no partial credit: a channel in the cement or a shoe that doesn't hold pressure means a well control problem later, at a much higher cost than catching it now. The casing and cement program, the pump schedule, and the pressure test results have to be reviewed and signed off by a drilling engineer or well-integrity lead before the rig moves on, and that sign-off has to be on record if a regulator or a partner ever asks to see it.

Kissflow runs casing and cementing sign-off as an approval workflow: an intake form for the casing program and cement design, a technical and well-integrity review step, multi-stage approval with delegation so a sign-off doesn't wait on one engineer, and an evidence log that attaches the pressure test result and the cement bond log to the record before the well proceeds.

The well file that comes out the other end is the audit trail: which cement design was approved, who reviewed it, what the pressure test showed, and when the rig was cleared to move to the next stage.

Where casing and cementing sign-off breaks down on the rig

The cement design isn't checked against the well

A slurry recipe gets approved on paper without a check against actual hole conditions or offset well data.

Pressure test results live on a driller's report

The evidence that isolation held is a paper ticket in a rig folder, not linked to the approval that cleared the well to proceed.

Sign-off waits on one engineer

The well sits on standby because the one person who can approve the program is unreachable.

No record survives past the well

When a regulator or a partner asks for the casing and cementing sign-off history, it's a search through old rig reports.

Six modules. Every casing and cement job reviewed, approved, and proven with evidence.

Configure well stages, review criteria, and approval chains to your drilling program.

Casing and cement program intake

The drilling engineer submits the casing string design, cement slurry recipe, and pump schedule through a structured form.

Technical and well-integrity review

The program is checked against hole conditions, offset well data, and well-integrity standards before it moves to approval.

Multi-stage approval with delegation

Sign-off routes through the drilling engineer and well-integrity lead, with delegation so the well doesn't sit idle waiting on one approver.

Pressure test and cement bond log evidence

The pressure test result and cement bond log are attached to the record as proof that isolation was confirmed, not assumed.

Well file audit trail

Every version of the program, every reviewer, and every approval timestamp builds the permanent well file record.

Status dashboard

The rig site and the office see the same real-time view of where each casing and cement approval stands.

From request to system of record in four steps

Submit

Submit

The drilling engineer submits the casing design and cement slurry recipe for the current well stage.

Review

Review

The program is checked against hole conditions and well-integrity standards.

Approve

Approve

Multi-stage sign-off clears the well to run casing and pump cement.

Record

Record

Pressure test results and cement bond logs attach to the record before the rig moves to the next stage, so zonal isolation is confirmed rather than assumed.

What changes when casing and cementing approval runs on Kissflow

Process
Before Kissflow
On Kissflow
Program submission
A form emailed to the drilling engineer
Structured intake tied to the well and the current stage
Technical review
Checked against the engineer's memory of similar wells
Checked against logged offset well data and well-integrity standards
Approval sign-off
Waits on one engineer's availability
Delegation keeps the chain moving
Pressure test evidence
A paper ticket in a rig folder
Attached directly to the approval record
Cement bond log
Filed separately from the approval
Logged against the same well-stage record
Well file history
Reconstructed from old rig reports on request
A permanent, searchable audit trail
Process Before Kissflow On Kissflow
Program submission A form emailed to the drilling engineer Structured intake tied to the well and the current stage
Technical review Checked against the engineer's memory of similar wells Checked against logged offset well data and well-integrity standards
Approval sign-off Waits on one engineer's availability Delegation keeps the chain moving
Pressure test evidence A paper ticket in a rig folder Attached directly to the approval record
Cement bond log Filed separately from the approval Logged against the same well-stage record
Well file history Reconstructed from old rig reports on request A permanent, searchable audit trail

Connects to your well data management system or ERP; Kissflow doesn't replace your engineering system of record

Kissflow runs the review, approval, and evidence layer. Your well data management or ERP system stays the system of record for the well file and the engineering design.

Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo

Built for how casing and cementing sign-off actually happens

Review before approval, not after

Casing and cement programs are checked against well-integrity standards before sign-off, not audited after the fact.

Evidence attached to the decision

The pressure test and cement bond log sit on the same record as the approval that cleared them.

Delegation keeps the rig moving

A sign-off doesn't stall because one engineer is offline.

Live in weeks

Configure well stages and approval chains in the visual builder, or describe the use case to the AI Builder.

Governed from day one

Role-based access and a full audit trail on every program and approval.

A well file that survives the well

Every approval, reviewer, and evidence attachment stays on record long after the rig has moved on.

We help drilling teams make well-integrity sign-off a record, not a memory

McDermott

“If a company cannot enable everybody to use AI, they will never get the true benefit of AI. Platforms like Kissflow allow us to put that capability in the hands of our users in a safe way.”

Vagesh Dave

GVP & CIO at McDermott International, Ltd

See The Full Story
KEY HIGHLIGHTS
5M+
work items processed
5,526
active users
400+
active workflow created without IT dependency
Puma Energy
INDUSTRY Energy
HEADQUATERS USA

“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”

Tanay Tiwary

Global Head - Digitalization & Business Improvement

See the Full Story
KEY HIGHLIGHTS
700+
Use Cases
73%
Operation Efficiency
1001 - 5000
# of Employees
SN Aboitiz Power Group

“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time.”

Maria Theresa Cabigon

CIO, SN Aboitiz Power Group

See The Full Story
KEY HIGHLIGHTS
451%
ROI
2.8 months
Payback period
Previous
    Next

    See what Kissflow can do for you

    Talk to us

    Got questions? We're here to help.

    Get Support

    No. Your well data management system or ERP stays the system of record for the well file and engineering design. Kissflow runs the review, approval, and evidence layer on top of it.

    Drilling Program Change Management System handles a mid-well change to an already-sanctioned drilling program, like an unplanned casing point shift. This app is the planned, stage-by-stage sign-off for the casing and cement job itself.

    Drilling & Well Planning Management System covers the upfront well design and cross-discipline sign-off before spud. This app is the execution-stage approval for one specific operation: running casing and pumping cement.

    Yes. Both attach to the same well-stage record as the approval that cleared the rig to proceed.

    Whoever you configure, typically the drilling engineer and a well-integrity lead, with delegation rules if the primary reviewer is unavailable.

    Yes. Each well and each casing stage has its own record, rolled up into one dashboard across every active rig.

    Configuration and AI-assisted app generation move delivery from a multi-month program to a matter of weeks.

    Kissflow is certified to SOC 1, SOC 2, SOC 3, and ISO/IEC 27001, with role-based access and a full audit log on every program and approval.