Every engineering change is a scrap risk until the last sign-off lands.
Kissflow runs the engineering change lifecycle on one system, alongside your PLM and ERP, so the change notice generates only when every required function has cleared its gate.
4.3/5
Trusted by manufacturers worldwide
A change is only as good as the last department to hear about it.
One change, five functions
A single revision to a released part touches engineering, quality, manufacturing, procurement, and supply chain before it can go live.
Change control is auditable
ISO 9001 clause 8.5.6 requires controlled change and retained documented information on who authorized it and what followed.
A missed distribution list is the costliest miss
When tooling cuts to a superseded revision, the scrap and the launch slip land together, and neither is recoverable.
Changes reopen the submission
An engineering change to a production part triggers customer notification and, in many cases, a fresh PPAP submission.
Dashboards report, workflows don't
The PLM holds the revision, while the question of who still has to sign off lives in a spreadsheet and a memory.
Email is the escalation engine
A coordinator chases five departments individually and finds out about a blocker when somebody replies.
Your core systems stay in place. The workflow connects them in one place.
Five functions, one change record, and nothing you already run has to move.
The teams running the engineering change lifecycle
Engineering, quality, manufacturing, procurement, and supply chain. Five functions, one change record.
The governed execution layer
Captures and classifies the request, runs four impact assessments in parallel, assembles one decision view for the board, and holds release until every selected readiness gate is closed by its owner.
Everything you already run
Your PLM, ERP, MES, CAD, and quality systems. API and integration connectors. Nothing existing moves.
Built for every stage of the engineering change lifecycle
Built for how engineering change actually runs.
Six things that separate a governed change record from a chased distribution list.
An action layer, not another dashboard
Kissflow runs the cross-functional coordination that a PLM records but does not chase.
Built for change workflows
Intake, impact assessment, board review, readiness gates, and notice generation arrive configured rather than built.
Rollout in 30 to 60 days
One change type goes live in weeks, and the gate structure carries to the next without a second implementation.
Audit-ready governance built in
Every assessment, vote, and sign-off is timestamped and attributed as a by-product of doing the work.
Connects to your existing systems
Kissflow works alongside whatever you already run, across PLM, ERP, MES, CAD, and quality systems.
Built for fusion teams
Change coordinators configure the gates they own while IT retains permissions, integration, and audit control.
Award-winning 451% ROI
Nucleus Research determined that SN Aboitiz Power Group got 451% ROI and achieved payback in 2.8 months
Manufacturing teams already running on Kissflow
“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”
Tanay Tiwary
Global Head - Digitalization & Business Improvement
Watch Story
“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time”
Maria Theresa Cabigon
CIO
Watch Story
“Everyone uses Kissflow. It requires no previous training. The platform is very intuitive and user-friendly.”
Antonio Serpa Pinto
Head of IT
Watch StoryRecognized by the industry's most trusted voices
Recognized by
The Forrester Wave™:
AppGen and Low-Code Platforms Landscape, Q1 2026
Gartner Hype Cycle™:
CADP, No-Code 2026
IDC :
LCNC 2025
The questions buyers ask before the demo.
Your PLM holds the part, the revision, and the drawing, and it should keep doing that. What it rarely governs is the cross-functional coordination around a change, including which departments still owe an assessment and which readiness gates remain open. Kissflow runs that layer.
No. Your PLM, ERP, MES, and quality systems remain the system of record. Kissflow connects through API and integration connectors and runs the coordination alongside them.
One change type and one gate set go live in 30 to 60 days. Additional change types reuse the same structure rather than requiring a new implementation.
Clause 8.5.6 requires controlled change with retained documented information on the authorization and the actions arising. Kissflow timestamps and attributes every assessment, board decision, and readiness sign-off on the same record.
Yes, and that is deliberate. Gates are selected per change rather than applied uniformly. A gate that is not selected is excluded rather than auto-approved, so the record shows what was assessed and what was not.
Pricing depends on user mix across engineering, quality, procurement, and supply chain, since most reviewers need light access rather than full seats. A solution engineer can model this against your change volume and headcount.