APQP (Advanced Product Quality Planning) Software

A new part program moves from quote to launch through five defined phases, and the deliverables due at each gate, design FMEAs, control plans, capability studies, live in a dozen owners' folders until someone assembles them for the review. Kissflow runs the whole program as one gated record.

APQP (Advanced Product Quality Planning)

Trusted by energy operators worldwide

Saint-Gobain
Sealed Air
Pernod Ricard
Mattel
Fossil
EssilorLuxottica

Every APQP phase, gate, and deliverable tracked against one program record, not a folder per owner

A new part program moves from quote to launch through five defined phases: plan and define, product design, process design, product and process validation, and launch. Each phase has its own deliverables, a design FMEA here, a control plan there, a capability study from a validation run, owned by different engineers and functions, and none of it lives anywhere a program manager can see all at once before the gate review. The week before launch sign-off usually means someone assembling five people's folders into one binder.

Kissflow runs APQP as a single gated program: deliverables are assigned, tracked, and linked to the actual documents they produce, a gate review can't close until they're complete, and the program's status is visible from kickoff to launch sign-off. A new program sets up against the five APQP phases with the cross-functional team assigned to each, and deliverable ownership spreads across design, process, quality, and manufacturing with visibility into what's outstanding. Risks and open issues raised during any phase log and track to resolution before they can block a gate, and a dashboard shows every program's phase, deliverable status, and gate readiness.

A five-phase program without a gated tracker is five phases nobody can see at once

Deliverables scatter across owners

A design FMEA, a control plan, and a capability study each live with a different engineer, with no shared view of what's complete.

Gates close on a status meeting, not a checklist

A phase gets marked complete because the review meeting ran out of objections, not because every required deliverable was verified.

Cross-functional teams lose track of dependencies

Process design work starts before product design deliverables are actually finalized, because nobody flagged the dependency.

Launch readiness is assembled at the last minute

The evidence a launch gate needs gets pulled together the week of the review instead of tracked as it's produced.

Six modules. Configurable to your operating model.

Every module ships with default forms, approval logic, integrations, and dashboards. Configure each one to your operating model in the visual builder.

Program & phase setup

Sets up a new part program against the five APQP phases, with the cross-functional team assigned to each phase.

Deliverable tracking

Tracks each phase's required deliverables, design FMEA, control plan, capability study, and more, to completion.

Cross-functional task assignment

Assigns deliverable ownership across design, process, quality, and manufacturing, with visibility into what's outstanding.

Gate review & sign-off

Requires every phase's deliverables to be complete before the gate review can close, with a recorded sign-off.

Risk & issue log

Logs risks and open issues raised during any phase, tracked to resolution before they can block a gate review.

Program dashboard

Shows every active program's phase, deliverable status, and gate readiness across the plant in one dashboard.

From request to system of record in four steps

Plan

Plan

A program phase opens with its required deliverables and cross-functional owners assigned in one workspace.

Assign

Assign

Each deliverable, from design FMEA to capability study, is distributed to its owner with due dates and linked to the document it produces.

Execute

Execute

Deliverables are tracked to completion on one board, and the gate review checks every one against the phase's completion criteria.

Close-out

Close-out

The phase is signed off and the program advances, or holds open issues until it can, with the full gated record retained for audit.

What changes when APQP runs on Kissflow

Process
Before Kissflow
On Kissflow
Deliverables
Scattered across owners' folders
Tracked and linked to one program record
Gate closure
Based on a status meeting
Requires every deliverable verified complete
Dependencies
Tracked informally, if at all
Visible across phases before they cause a delay
Cross-functional visibility
Each function sees its own piece
One dashboard across design, process, quality, and manufacturing
Risk & issues
Raised in meetings, tracked nowhere
Logged and tracked to resolution before the gate
Launch readiness
Assembled the week of the review
Visible continuously as deliverables complete
Process Before Kissflow On Kissflow
Deliverables Scattered across owners' folders Tracked and linked to one program record
Gate closure Based on a status meeting Requires every deliverable verified complete
Dependencies Tracked informally, if at all Visible across phases before they cause a delay
Cross-functional visibility Each function sees its own piece One dashboard across design, process, quality, and manufacturing
Risk & issues Raised in meetings, tracked nowhere Logged and tracked to resolution before the gate
Launch readiness Assembled the week of the review Visible continuously as deliverables complete

Connects to the PLM, ERP, and quality systems already holding your program documents

Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo

Built for running five phases as one program, not five folders

Gates that actually enforce deliverable completion

A phase can't close until its required deliverables are verified, not just discussed.

Built for cross-functional ownership

Design, process, quality, and manufacturing all see the same program status, with their own assignments.

A recorded gate sign-off, every time

Every gate review has a documented decision, not a verbal go-ahead in a meeting.

Links to the deliverables that make up the program

PFMEA, control plan, and PPAP live as connected apps, not standalone documents referenced by memory.

Live in weeks, not a re-implementation

Configure phases, deliverables, and gate criteria in the visual builder without a PLM-scale rollout.

One dashboard across every active program

See phase, deliverable, and gate status for every part program running in the plant.

We help manufacturers run APQP as one gated program instead of five phases in five folders

McDermott

“If a company cannot enable everybody to use AI, they will never get the true benefit of AI. Platforms like Kissflow allow us to put that capability in the hands of our users in a safe way.”

Vagesh Dave

GVP & CIO at McDermott International, Ltd

See The Full Story
KEY HIGHLIGHTS
5M+
work items processed
5,526
active users
400+
active workflow created without IT dependency
Puma Energy
INDUSTRY Energy
HEADQUATERS USA

“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”

Tanay Tiwary

Global Head - Digitalization & Business Improvement

See the Full Story
KEY HIGHLIGHTS
700+
Use Cases
73%
Operation Efficiency
1001 - 5000
# of Employees
SN Aboitiz Power Group

“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time.”

Maria Theresa Cabigon

CIO, SN Aboitiz Power Group

See The Full Story
KEY HIGHLIGHTS
451%
ROI
2.8 months
Payback period
Previous
    Next

    See what Kissflow can do for you

    Talk to us

    Got questions? We're here to help.

    Get Support

    No. It coordinates the overall APQP program and gates, and links to those apps as the deliverables each phase actually produces.

    Yes. The phase structure, deliverables, and gate criteria are configurable to your APQP methodology, whether you follow AIAG's model or your own variant.

    Routing is configurable, typically the program manager with sign-off from each represented function, design, process, quality, and manufacturing.

    It's built around the specific APQP phase and deliverable structure, with gates that enforce deliverable completion rather than a generic task list.

    Yes. Program managers configure phases, deliverables, and gate criteria in the visual builder, and the AI Builder can generate a working app from a plain-language description.

    Through APIs and integration connectors, under single sign-on and role-based access, with every action written to an audit log.

    Configuration and AI generation move delivery from weeks to days, without a multi-year platform program or an engineering backlog.

    Kissflow is certified to SOC 1, SOC 2, SOC 3, ISO/IEC 27001, HIPAA, GDPR, and CCPA, hosted on Google Cloud with data residency in the US, EU, APAC, and Oceania.