MANUFACTURING | PRODUCTION PLANNING | SCHEDULE CHANGES | AUTHORIZATION

Production Schedule Change Authorization Software

Production Schedule Change Authorization Software routes mid-shift schedule changes to the planner, quality, and line owners the change actually affects, flags downstream impact before approval, and keeps a timestamped record. Kissflow runs that route instead of a phone chain.

Production Schedule Change Authorization Management System

Trusted by energy operators worldwide

Saint-Gobain
Sealed Air
Pernod Ricard
Mattel
Fossil
EssilorLuxottica

One authorization path for every change to a locked production schedule

A schedule was locked at Monday's planning meeting. By Tuesday a breakdown on line 3 forces a sequence swap, and the person making that call has no route to sign-off before the next shift cuts stock against the old plan. They call the supervisor, who calls the planner, and the change happens anyway because the line cannot sit idle. Whether quality, maintenance, and the downstream line were told is a matter of who remembered to forward the email.

Kissflow runs schedule change authorization as a governed application instead of a phone chain. Anyone requesting a change logs it with the reason, the affected orders, and the shift on a guided form, and the request routes automatically to whoever the change actually touches, with delegation so an unavailable approver never stalls production. Downstream impact on packaging, changeover, and material staging is flagged before approval, not discovered after the line has already started running the wrong sequence. Every decision is timestamped, and requesters see where their change sits without pinging the planning office. Kissflow sits alongside your MES and ERP as the authorization layer for changes those systems were never built to route.

Every schedule change that skips authorization is a risk nobody signed up for

Changes ship on a phone call

Verbal change requests bypass planning review entirely, so the schedule board and the floor disagree by mid-shift.

Downstream impact goes unchecked

A change to one line's run order can starve a downstream line of the wrong material, and no one checks that before the change ships.

No record of who approved what

When a late shipment traces back to an unauthorized schedule change, there is no approval record showing what was decided and by whom.

Requesters wait without visibility

A supervisor requesting a schedule change has no way to see where the request sits or who is holding it up.

Six modules. Configurable to your planning policy.

Every module ships with default forms, approval logic, integrations, and dashboards. Configure each one to your operating model in the visual builder.

Change request intake

A guided form that captures the change, the reason, affected orders, and shift, so an unlogged verbal change never reaches the floor.

Multi-stage approval routing

Requests route automatically to planning, quality, and the line owners the change touches, with delegation so one absence never stalls it.

Downstream impact flag

Packaging, changeover, and material staging impact is flagged before approval, not discovered after the line runs the wrong sequence.

Audit trail

Every request, review, and decision is timestamped and attributed, building the change record as it happens instead of after the fact.

Live status tracking

Requesters and supervisors see exactly where a change sits in the queue without calling the planning office to ask.

Requester self-service portal

A self-service view where requesters submit changes and track their own status without routing every question through planning.

From request to system of record in four steps

Submit

Submit

The requester logs the schedule change with its reason, affected orders, and shift on a guided form before the line moves.

Review

Review

Packaging, changeover, and staging impact is checked automatically before the change reaches an approver.

Approve

Approve

The request routes to planning, quality, and line owners together, and the decision is timestamped and attributed.

Record

Record

The approved change updates the live schedule and is logged as the record of what changed and who authorized it.

What changes when schedule authorization runs on Kissflow

Process
Before Kissflow
On Kissflow
Change request
Travels by phone call or hallway note
Submitted through one structured intake form
Impact review
Nobody checks downstream material or changeover time
Impact flagged automatically before approval
Approval
Whoever is reachable signs off informally
Routed to the accountable planning or operations approver
Escalation
Stalled requests just wait
Automatic escalation when a decision is overdue
Record
No trace of who approved what
Every decision logged against the request
Visibility
Requester has no idea where things stand
Live status visible to requester and approvers
Process Before Kissflow On Kissflow
Change request Travels by phone call or hallway note Submitted through one structured intake form
Impact review Nobody checks downstream material or changeover time Impact flagged automatically before approval
Approval Whoever is reachable signs off informally Routed to the accountable planning or operations approver
Escalation Stalled requests just wait Automatic escalation when a decision is overdue
Record No trace of who approved what Every decision logged against the request
Visibility Requester has no idea where things stand Live status visible to requester and approvers

Connects to the planning and ERP systems you already run

Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo

Built for how plant scheduling actually changes

An authorization layer, not a new planning system

Your ERP or MES keeps the schedule of record. Kissflow runs the governed request and approval workflow around changes to it.

Live in weeks, not a re-implementation

Configure request types, approval routing, and impact checks in the visual builder, without a change request against the ERP.

Governance built into the workflow

Delegation, escalation, and a full audit log are how every change moves, not a control added on afterward.

Impact check before approval, not after

Material and changeover impact surface at the review stage, so an approver signs off with the full picture.

Self-service for the requester

Supervisors submit and track their own requests instead of calling planning to ask what happened.

Made for cross-team work

Planning, operations, and materials management see the same request record with their own view of it.

We help manufacturing leaders keep the schedule and the floor in sync

McDermott

“If a company cannot enable everybody to use AI, they will never get the true benefit of AI. Platforms like Kissflow allow us to put that capability in the hands of our users in a safe way.”

Vagesh Dave

GVP & CIO at McDermott International, Ltd

See The Full Story
KEY HIGHLIGHTS
5M+
work items processed
5,526
active users
400+
active workflow created without IT dependency
Puma Energy
INDUSTRY Energy
HEADQUATERS USA

“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”

Tanay Tiwary

Global Head - Digitalization & Business Improvement

See the Full Story
KEY HIGHLIGHTS
700+
Use Cases
73%
Operation Efficiency
1001 - 5000
# of Employees
SN Aboitiz Power Group

“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time.”

Maria Theresa Cabigon

CIO, SN Aboitiz Power Group

See The Full Story
KEY HIGHLIGHTS
451%
ROI
2.8 months
Payback period
Previous
    Next

    See what Kissflow can do for you

    Talk to us

    Got questions? We're here to help.

    Get Support

    No. Your ERP or MES stays the system of record for the schedule. Kissflow runs the request and approval workflow around changes made to it.

    Production Planning and Scheduling coordinates building the plan itself. This app governs a single change request against a schedule that is already locked and running.

    Any adjustment to run order, quantity, or timing on a locked schedule: a rush order, a material shortage, an equipment breakdown, or a customer date change.

    Routing is configurable. Typically the plant planning lead and, for higher-impact changes, an operations manager, with delegation when either is unavailable.

    Yes. Process owners configure forms, routing, and thresholds in the visual builder, and the AI Builder can generate a working app from a plain-language description.

    Through APIs and integration connectors, under single sign-on and role-based access, with every action written to an audit log.

    Configuration and AI generation move delivery from weeks to days, without a multi-year platform program or an engineering backlog.

    Kissflow is certified to SOC 1, SOC 2, SOC 3, ISO/IEC 27001, HIPAA, GDPR, and CCPA, hosted on Google Cloud with data residency in the US, EU, APAC, and Oceania.