MANUFACTURING | PRODUCTION | PLANNING | SCHEDULING

Production Planning and Scheduling Software That Keeps Every Function on the Same Plan

A production planning and scheduling app sets the plan, coordinates line clearance, execution, and exceptions against it, and tracks the schedule from kickoff to closure, so a plan change reaches every function at once instead of by phone call to whoever answers.

Production Planning and Scheduling Software

Trusted by energy operators worldwide

Saint-Gobain
Sealed Air
Pernod Ricard
Mattel
Fossil
EssilorLuxottica

A schedule in a spreadsheet does not tell the floor what changed

The plan says line 3 changes over at 2 PM. Half the plant finds out at 2:05, when the wrong material is already staged and someone starts making calls. Production plans typically live in a scheduling tool or a spreadsheet that production planning owns and everyone else checks periodically, so when the plan changes, whoever is not on the distribution list learns about it from the floor instead of from the system.

Kissflow runs production planning and scheduling as one coordinated app instead of a plan and a set of disconnected trackers. The schedule, line clearance status, execution log, and any exceptions all live on the same record, so a change to the plan is visible to production, quality, and maintenance the moment it is made, not at the next standup. A line that falls behind plan generates a tracked exception with a reason, rather than getting absorbed silently and explained verbally at handover.

Planners configure the schedule, milestones, and dependencies themselves in the visual builder, and line clearance is confirmed against the same record it is meant to clear, so a changeover cannot start on the strength of an unlogged verbal confirmation.

A production schedule that lives in one spreadsheet reaches half the plant

Plan changes travel by phone call

A schedule update reaches whoever the planner remembers to call, not everyone who needs to act on it.

Line clearance is a separate checklist

Readiness for a changeover is confirmed on paper, disconnected from the schedule that says the changeover is happening.

Deviations get absorbed silently

A line that falls behind plan gets fixed informally, with no record of why the schedule slipped.

Handover between shifts loses the plan context

The incoming shift inherits a schedule without knowing what already changed or why.

Six process modules

Every module ships with default forms, routing logic, and dashboards. Configure each one to your operating model in the visual builder.

Production plan and schedule

Sets the production plan by line, product, and shift, with milestones and dependencies visible to every function.

Line clearance tracking

Confirms readiness, material, and documentation before a changeover, linked directly to the schedule it clears.

Execution logging

Captures actual output and progress against the plan as production runs, not at shift-end reconciliation.

Exception handling

A schedule deviation opens a tracked exception with a reason and an owner, instead of an informal workaround.

Shift handover

Open exceptions and schedule context carry forward automatically into the next shift's handover record.

Schedule adherence reporting

Rolls schedule adherence up by line and plant into a report that shows where the plan and reality diverge.

From request to system of record in four steps

Plan

Plan

Planners set the schedule by line, product, and shift, with milestones and dependencies attached in one place.

Assign

Assign

Production, quality, and maintenance are each given their part of the live schedule, with line clearance and execution responsibilities distributed against it.

Execute

Execute

Work runs against the live schedule, and any deviation from plan opens a tracked exception with a reason, so slippage never goes unrecorded.

Close-out

Close-out

The shift closes against the plan and the record rolls into an adherence report automatically, ready for the next cycle.

What changes when production scheduling runs on Kissflow

Process
Before Kissflow
On Kissflow
Schedule updates
Communicated by phone call or chat
Visible to every function on the same live record
Line clearance
Confirmed on a separate paper checklist
Linked directly to the schedule it clears
Execution tracking
Reconciled at shift-end
Captured against the plan as production runs
Plan deviations
Fixed informally, undocumented
Opened as a tracked exception with an owner
Shift handover
Explained verbally at changeover
Carries plan status and open items forward automatically
Adherence reporting
Assembled manually before each review
Rolled up live by line, product, and plant
Process Before Kissflow On Kissflow
Schedule updates Communicated by phone call or chat Visible to every function on the same live record
Line clearance Confirmed on a separate paper checklist Linked directly to the schedule it clears
Execution tracking Reconciled at shift-end Captured against the plan as production runs
Plan deviations Fixed informally, undocumented Opened as a tracked exception with an owner
Shift handover Explained verbally at changeover Carries plan status and open items forward automatically
Adherence reporting Assembled manually before each review Rolled up live by line, product, and plant

Connects to the systems your plant already runs on

Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo
Integration logoIntegration logo

Built for how a production schedule actually runs

One plan, every function

Production, quality, and maintenance work from the same live schedule instead of separate copies.

Line clearance tied to the schedule

Readiness checks link directly to the run they clear, so a changeover cannot start against a stale record.

Deviations become tracked exceptions

A schedule slip opens a record with an owner, instead of disappearing into an informal fix.

Live in weeks

Configure the plan structure and routing in the visual builder, without a multi-month scheduling system rollout.

Handover carries the plan forward

Shift changes inherit schedule status and open exceptions automatically, with full context.

Adherence visible across every plant

Plan-versus-actual performance rolls up across lines and sites into one planning review.

We help production planners keep the whole plant on one schedule

McDermott

“If a company cannot enable everybody to use AI, they will never get the true benefit of AI. Platforms like Kissflow allow us to put that capability in the hands of our users in a safe way.”

Vagesh Dave

GVP & CIO at McDermott International, Ltd

See The Full Story
KEY HIGHLIGHTS
5M+
work items processed
5,526
active users
400+
active workflow created without IT dependency
Puma Energy
INDUSTRY Energy
HEADQUATERS USA

“Advanced automation of all processes is easy to set up. I cannot imagine how to manage workflows without this software.”

Tanay Tiwary

Global Head - Digitalization & Business Improvement

See the Full Story
KEY HIGHLIGHTS
700+
Use Cases
73%
Operation Efficiency
1001 - 5000
# of Employees
SN Aboitiz Power Group

“Kissflow supports rapid application development by building a working application prototype in the shortest amount of time.”

Maria Theresa Cabigon

CIO, SN Aboitiz Power Group

See The Full Story
KEY HIGHLIGHTS
451%
ROI
2.8 months
Payback period
Previous
    Next

    See what Kissflow can do for you

    Talk to us

    Got questions? We're here to help.

    Get Support

    It is a governed application that sets the production schedule, coordinates line clearance and execution against it, and tracks deviations as exceptions, so every function works from the same live plan.

    A spreadsheet holds the plan but nothing enforces who sees an update or tracks what happened when the plan slipped. This app makes the schedule, clearance status, and exceptions visible to every function on one record.

    Pre-Production Management covers the readiness work before a run starts. This app owns the schedule itself and the execution and exception tracking once the plan is underway.

    Yes. Planners configure the schedule structure, milestones, and routing rules in the visual builder.

    No. The ERP stays the system of record for orders and materials. This app runs the planning, clearance, and exception workflow around it.

    A deviation opens a tracked exception with an owner and a due date, instead of being absorbed as an informal fix with no record.

    Yes. Schedule adherence rolls up by line, product, and plant into one reporting view for corporate planning reviews.

    Configuration in the visual builder typically brings a plant's schedule live in weeks.